PUBLIC NOTICE
The U.S. Department of Commerce, Economic Development Administration
(EDA) is considering a request for Federal assistance from the City-County
of Butte-Silver Bow to construct a Silver Lake Water System (SLWS)
Improvements Project in Butte, Silver Bow County, Montana and Anaconda,
Deer Lodge County, Montana. Pursuant to the National Environmental Policy
Act of 1969, as amended, EDA is conducting an environmental assessment
(EA) of the proposed project.
The Silver Lake Water System Improvements Project addresses several
deficiencies in the water storage, pumping, and distribution system.
Butte-Silver Bow (BSB) selected the following improvements to address
the identified deficiencies: (1) Replace the Ramsay Pump Station by
expanding the adjacent TIFID Pump Station facility (Location: 46.008061°N,
-112.676476°W); (2) Upgrade the Silver Lake East Dam outlets by
separating the existing pump and gravity outlets, allowing BSB to discharge
through the dam at two separate locations (Location: 46.166832°N,
-113.216290°W); (3) Upgrade the Silver Lake Pump Station by replacing
the 250 horsepower pump motors, installing variable frequency drives, and
repairing or replacing the damaged intake pipe (Location: 46.166030°N,
-113.221198°W); and (4) Update the SLWS instrumentation and flow
measurement by adding new lake level and flow measurement locations
throughout the system along with automation of data at both new
and existing instruments. This data will be integrated into Butte-Silver
Bow’s supervisory control and data acquisition (SCADA) system where
it can then be viewed real time and historized for trending and record
keeping purposes.
Instrumentation and Flow
Locations
Storm Lake
46.074520°N, -113.267730°W
Storm Lake Creek
46.163860°N, -113.215170°W
Coordinates
Storm Lake Creek Supply Ditch
46.150590°N, -113.214000°W
Silver Lake
46.166030°N, -113.221198°W
Silver Lake Aqueduct
46.165809°N, -113.211739°W
Twin Lakes Diversion
46.148070°N, -113.186270°W
Twin Lakes Flume
Warm Springs Creek at Stumptown
Bridge
46.148510°N, -113.185850°W
46.157460°N, -113.049840°W
SLWS Pipeline at Meyers Diversion
46.153350°N, -113.037260°W
SLWS Pipeline TIFID Pump Station
SLWS Pipeline Summit Valley
Inter-Connect
46.007980°N, -112.676610°W
45.998280°N, -112.561510°W
Project information is available for review at the Butte-Silver Bow
Community Development Office, Butte-Silver Bow County Courthouse,
155 W. Granite, Room 111, Butte, Montana (406) 497-6478. Information
is also available in the “Silver Lake Water System Improvements Project”
folder at co.silverbow.mt.us/DocumentCenter.
If you have any information regarding potential environmental impacts
associated with this proposed project, please provide it in writing via
EMAIL to:
Regional Environmental Officer
U.S. Department of Commerce
Economic Development Administration
Denver Region
1244 Speer Blvd Ste 431
Denver, CO 80204
jbenz@eda.gov
Comments received in the EDA Regional Office by 5:00 pm on
May 30, 2022, will be considered. A copy of the NEPA decisional document
will be available upon request at the above EDA Regional Office.
May 13, 14, 15, 2022 MNAXLP